The Hanson barge tied alongside a dock under construction.

Services

Everything between your yard and the channel.

Six things we build, one crew that builds them, and a barge that keeps all of it off your lawn.

  • A wide Hanson dock, freshly decked, running out over calm water.

    Dock Construction & Repair

    Fixed docks engineered for tide, storm and decades of use.

    Docks detailsDock Construction & Repair
  • A Hanson pier with an L-head platform, boats and a marina beyond.

    Pier Construction

    Long-reach piers that get you to deep water.

    Piers detailsPier Construction
  • A new vinyl sheet pile bulkhead with a timber cap along a lawn.

    Bulkheads & Seawalls

    Stop erosion for good with vinyl or timber bulkheads.

    Bulkheads detailsBulkheads & Seawalls
  • Graded armor stone placed along a shoreline beside a timber walkway.

    Rip Rap & Living Shorelines

    Armor stone that looks natural and calms the wave.

    Rip Rap detailsRip Rap & Living Shorelines
  • A covered boathouse with a hip roof over a boat lift and floating dock.

    Boat & Jet Ski Lifts

    Keep your boat out of the water and ready to run.

    Boat Lifts detailsBoat & Jet Ski Lifts
  • A timber walkway running along a waterfront house with rip rap and marsh beyond.

    Floating Docks

    Docks that rise and fall with the tide.

    Floating Docks detailsFloating Docks

How a job runs

From your first call to the last board.

  1. 01Within a few days

    Call & site visit

    Shane comes out, walks the shoreline with you, checks water depth and bottom conditions, and talks through how you actually use the water. No charge, no obligation.

  2. 02About a week

    Design & written quote

    You get a drawing and a written scope with materials named and a firm price — not a range. If there is a cheaper way to get you what you want, it is in the quote.

  3. 034–10 weeks

    Permitting

    We prepare and submit the VMRC and Army Corps package, notify adjacent owners, and handle local approval. In Currituck County it goes through CAMA. You sign; we chase the agencies.

  4. 041 day

    Mobilise by water

    The barge, the excavator and every pile, stone and board arrive by water. Nothing crosses your lawn, your septic field or your driveway.

  5. 051–2 weeks on site

    Build

    Piles driven to refusal, wall tied back and capped, stringers through-bolted, deck laid to drain. Same crew from the first pile to the last board.

  6. 06Last day

    Walk-through & clean-up

    Cut-offs hauled off, water cleared of debris, and a walk-through with Shane before we call it done. Anything not right gets fixed then.

Tell us what you want on your water.

Site visits are free and Shane does them himself. You will get a drawing and a written price, not a ballpark over the phone.

Get a QuoteCall 757-751-2553

Virginia Class A Marine Contractor · Hampton Roads, VA & Currituck, NC