
Boat & Jet Ski Lifts
Hanson Marine Construction installs cradle, elevator and PWC lifts up to 30,000 lb, including driving the lift pilings and coordinating electrical. Most lifts are installed in one to two days once piles are in.
A lift keeps the hull dry, the bottom clean and the boat safe when weather comes. We drive the pilings, set the beams and level the cradle to your hull.
How we build it
The work, step by step.
- 01
Size the lift
Boat weight wet, beam and how you back in decide the lift.
- 02
Drive pilings
Lift piles driven plumb and to depth so the cradle never racks.
- 03
Set & wire
Beams hung, motors mounted, electrician coordinated, cradle adjusted to your hull.

Materials.
- Aluminum 4-post cradle lifts
- Elevator lifts for narrow lots
- PWC / jet ski lifts
- Vinyl-sleeved lift pilings
Boat Lifts: what people ask
- What size lift do I need?
- Take the boat's dry weight, add fuel, water, gear and motor(s), then round up 20%. We'll confirm on the site visit.
- Can you add a lift to my existing dock?
- Yes — most lifts go beside an existing dock with two or four new pilings.
Pairs well with

Dock Construction & Repair
Fixed docks engineered for tide, storm and decades of use.
Docks detailsDock Construction & Repair
Ready to talk about your boat lifts?
Shane walks the site himself, then sends a drawing and a written price. No charge for the visit.
