A new vinyl sheet pile bulkhead with a timber cap along a lawn.

Services · Bulkheads

Bulkheads & Seawalls

Sheet pile, tie-backs and deadmen sized for your soil — the line holds and the yard stops leaving.

Hanson Marine Construction installs new and replacement bulkheads in vinyl sheet pile or timber, with tie-backs and deadmen sized for your soil, anywhere in Hampton Roads or Currituck County.

Every storm takes a little more of an unprotected bank. A properly built bulkhead — sheet pile, walers, tie-backs and deadmen — holds the line for 30+ years.

We build most walls in vinyl sheet pile today: it never rots, never rusts and holds its color.

How we build it

The work, step by step.

  1. 01

    Assess the failure

    Leaning wall, washouts behind it, rotted cap — we find the cause before quoting the fix.

  2. 02

    Drive sheeting

    Sheets driven from the barge or shore-side excavator to design embedment.

  3. 03

    Tie back & cap

    Walers, tie rods and deadmen installed, then backfilled and capped.

A new vinyl sheet pile bulkhead with a timber cap along a lawn.

Materials.

  • Vinyl sheet pile (CMI / ShoreGuard)
  • Timber sheeting & walers
  • Galvanized tie rods & deadmen
  • Filter fabric & clean backfill

Bulkheads: what people ask

Vinyl or timber bulkhead?
Vinyl is the long-term choice — no rot, no marine borers, no staining. Timber is cheaper up front and still appropriate for some low-energy sites.
Can you build in front of my old wall?
Often yes. A new wall set just waterward of the failing one avoids demolition and keeps your yard intact.
How long does a bulkhead last?
Vinyl walls are typically warrantied 50 years. Timber walls average 20–25 years.

Pairs well with

Ready to talk about your bulkheads?

Shane walks the site himself, then sends a drawing and a written price. No charge for the visit.

Get a QuoteCall 757-751-2553

Virginia Class A Marine Contractor · Hampton Roads, VA & Currituck, NC