
Dock Construction & Repair
Hanson Marine Construction builds and repairs fixed timber and composite docks for waterfront homeowners in Hampton Roads and Currituck County. Most residential docks are permitted, driven and decked within four to eight weeks of approval.
A dock is the front door to your waterfront. We build it to survive the Chesapeake's tides, nor'easters and marine borers — driven piles, hot-dipped hardware and decking that stays flat.
Shane runs every job from the barge, so the crew that drives your piles is the crew that decks your walkway.
How we build it
The work, step by step.
- 01
Site visit & design
We walk your shoreline, check water depth and bottom conditions, and draw the dock to fit how you use the water.
- 02
Permitting
We prepare and submit the VMRC / Army Corps or Currituck County permit package on your behalf.
- 03
Pile driving
Piles are driven from our barge-mounted excavator to refusal — not jetted, not set in a hole.
- 04
Framing & decking
Stringers, joists and decking go on with corrosion-rated hardware, then we clean the site like we were never there.

Materials.
- CCA .80 marine-grade timber piles
- Composite or pressure-treated decking
- Hot-dipped galvanized or stainless hardware
- Vinyl-sleeved piles (optional)
Docks: what people ask
- How long does a new dock take?
- Permitting usually takes 4–10 weeks depending on the locality. Once approved, most residential docks are built in one to two weeks on site.
- Do I need a permit for a dock in Virginia?
- Yes — nearly all docks on tidal waters require a VMRC and/or Army Corps permit plus local approval. We handle the paperwork.
- Timber or composite decking?
- Composite costs more up front but never needs sealing and won't splinter. Treated timber is the budget option and lasts 15–20 years with care.
Pairs well with

Boat & Jet Ski Lifts
Keep your boat out of the water and ready to run.
Boat Lifts detailsBoat & Jet Ski Lifts
Bulkheads & Seawalls
Stop erosion for good with vinyl or timber bulkheads.
Bulkheads detailsBulkheads & Seawalls
Ready to talk about your docks?
Shane walks the site himself, then sends a drawing and a written price. No charge for the visit.
